Orient Way Carriage Sidings Depot

Award: excellent
87.2%

Whole Project Award

Project client: Olympic Delivery Authority (ODA)

image
 

The project

The new twelve-track railway sidings at Orient Way was built to replace the former Thornton’s Field sidings, an area in the heart of the Olympic Park site, between the Aquatics Centre and Olympic Stadium.

image
 

Recycling

Ninety-nine per cent of the demolition and site clearance waste was recycled, including:

  • 4,000 tonne of crushed concrete, of which 1,000 tonnes was re-used on site
  • 620 tonnes of tarmac
  • 180 tonnes of steel
  • 20,000 tonnes of previous site ballast was screened and re-used
  • All 3,250 yards of track was lifted and re-used.
image
 

Renewable energy

As part of the project, the ODA also built a new accommodation block for train drivers which is powered by a wind turbine. Many of the recyclable elements of the track were reused to built the block.

image: Award ceremony at the ICE Dinner, April 2009

Award ceremony at the ICE Dinner, April 2009

 

 

 

 